TRACE-P Updates |
Date | Change |
---|---|
6/11/01 | Revised Deployment Schedule to reflect actual dates of events/missions and added GMT column |
5/18/01 | Updated Appendix B by adding instrument description for Sandholm, Clarke, and Prather |
3/27/01 | Revised Deployment Schedule |
3/19/01 | Added Section 2.3.4 and 2.3.5 |
2/27/01 | Updated Table 7.0-1 |
2/27/01 | Updated Table 7.2.8-2 |
2/27/01 | Added Tables 7.8.3-1 and 7.8.3-3 |
2/27/01 | Added Table 7.8.5-1 |
2/27/01 | Added Table 7.8.6-1 |
2/27/01 | Added Tables 7.9-1 and 7.9-2 |
2/27/01 | Added Table 7.11-1 |
2/27/01 | Modified Table 8.2-1 |
2/27/01 | Modified Tables F1 and F4 in Appendix F |
2/16/01 | Added Appendix M Collaborative Agreements |
2/14/01 | Updated P3-B Instrument Layout |
2/14/01 | Updated Mission Maps in Figures 2.5-1 and 2.5-2 |
2/14/01 | Corrected phone number for Anderen Lodge in Guam in Appendix L |
2/14/01 | Updated Appendix K |
2/13/01 | Added Section 5.3 Ozone Network Measurements |
2/13/01 | Added Section 4.4 Ozone Network |
2/13/01 | Updated Appendix A |
2/12/01 | Revised Deployment Schedule |
2/12/01 | Added Section 7.6.3 Press Briefings |
2/8/01 | Added Section 7.6.2 Meetings |
2/8/01 | Changed Appendix N to Medical Considerations and changed References to Appendix O |
2/2/01 | Eliminated Section 8.2 and renamed Section 8.3 as the new Section 8.2 |
2/2/01 | Added ICATS to Appendix A of the Expedition Plan |
2/1/01 | Updated Appendix L of the Expedition Plan |
2/1/01 | Updated Appendix F of the Expedition Plan |
2/1/01 | Updated Section 8.1 of the Expedition Plan |
2/1/01 | Updated Section 7.6.1 of the Expedition Plan |
2/1/01 | Updated Section 7.5.8 of the Expedition Plan |
2/1/01 | Updated Section 7.5.1 of the Expedition Plan |
2/1/01 | Updated Section 6.2.3 of the Expedition Plan |
1/25/01 | Corrected the location of the Trinidad Head California ozonesonde station in Section 4.5.2 of the Expedition Plan |
1/25/01 | Added Section 7.5.6.2 to the Expedition Plan |
1/25/01 | Updated Table 4.1-1 and Table 4.2-1 to include Brune NO and NOx measurement |
1/23/01 | Updated Appendix A of the Expedition Plan |
1/19/01 | Added Sections 2.3.2-2.3.4 and 2.4-2.4.6 and renumbered the remainder of Section 2 |
1/19/01 | Made changes to Section 6.1 of the Expedition Plan |
1/18/01 | Made changes to Table 7.0-1 to Expedition Plan |
1/16/01 | Added Worldwide Caution Statement (section 7.5.4) to the Expedition Plan and renumbered sections 7.5.4 - 7.5.10.5 |
1/10/01 | Added Table 7.0-1 to Expedition Plan |
1/9/01 | Added Emergency Contact Information (section 7.5.4) to the Expedition Plan and renumbered sections 7.5.4 - 7.5.9.5 |
1/9/01 | Added information to Appendix L to the Expedition Plan |
1/5/01 | Added Site Managers Table 7.1-1 to Expedition Plan |
1/5/01 | Updated Appendix A of the Expedition Plan |
1/5/01 | Updated Appendix N of the Expedition Plan |
1/5/01 | Updated Table 5.0-1 of the Expedition Plan (Deployment Schedule) |
1/2/01 | Updated Section 7.1 of the Expedition Plan |
1/2/01 | Updated Section 7.5.5 of the Expedition Plan |
12/14/00 | Added Section 7.5.5 to the Expedition Plan |
12/14/00 | Added Appendix L to the Expedition Plan |
12/07/00 |
Updated Section 7.5.3 of Expedition Plan |
12/06/00 |
Updated Table5.0-1 of the Expedition Plan |
12/06/00 |
Updated Section 5.1 of the Expedition Plan |
12/06/00 |
Added Section 7.5.2 to the Expedition Plan |
11/29/00 | Extensive additions made to previously missing sections of the Expedition Plan |
11/15/00 | Made change to Section 4.8 of the Expedition Plan |