APPENDIX I  

SITE SUPPLIES AND EXPENDABLES  

Supplies and Equipment

 

Hong Kong

Yokota Air Base

Ops Center

Lab

Ops Center

Lab

Room Set-Up

Classroom style for 100 people with peripheral tables

Work benches and tables, chairs, and refrigerator

Theater style for 100 people with peripheral tables

Work benches and tables, chairs, and refrigerator

Phones

5 (local and  international calling)

2 (local and international calling)

5 (local and international calling)

2 (local and international calling)

Fax Machines

1 (capable of sending and receiving)

None

1 (capable of sending and receiving)

None

Internet

1056K dial-up lines*

2 phones with RJ11 analog dataports

10 56K dial- up lines

2 56K dial- up lines

Audio/Visual Equipment

2 overhead projectors and 2 screens

None

2 overhead projectors and 2 screens

None

Duplication Services

High-capacity copy machine

None

High-capacity copy machine

None

*Higher-speed internet access will be provided in the Meteorology Briefing Area, located in the airport which adjoins the hotel (first priority to for the mission meteorologists).

   

Site LN2 Requirements

 

Per Site

Total Including Evap. And Wastage

Average Per Day

Wallops

136 L

272 L

8 L

Dryden (integration)

722 L

1445 L

43 L

Kona (outbound)

71 L

141 L

48 L

Guam

83 L

165 L

83 L

Hong Kong

536 L

1071 L

83 L

Yokota

628 L

1255 L

60 L

Kona (return)

153 L

306 L

307 L

Dryden (P-3B only)

8 L

16 L

16 L

Notes:
Dryden integration includes layover for P-3B on 22-23 Feb      
Evaporation and wastage estimated to increase requirement 100%   

           

    Site Dry Ice Requirements

 

Per Site

Total Including Evap. And Wastage

Average Per Day

Wallops

1060 lbs

1166 lbs

35 lbs

Dryden (integration)

1260 lbs

1386 lbs

41 lbs

Kona (outbound)

145 lbs

160 lbs

54 lbs

Guam

140 lbs

154 lbs

77 lbs

Hong Kong

970 lbs

1067 lbs

83 lbs

Yokota

1340 lbs

1474 lbs

71lbs

Kona (return)

180 lbs

198 lbs

198 lbs

Dryden (P-3B only)

70 lbs

77 lbs

77 lbs

Notes:
Dryden integration includes layover for P-3B on 22-23 Feb
Evaporation and wastage estimated to increase requirement 10%                

 

     
PI LN2 Requirements

Site LN2 Requirements

(FltDays/Non-Flt Days)

PI/Aircraft LN2 Requirements
(Flight days/Non-Flight Days)

 

 

TOTALS

 

Apel-Riemer/DC-8 (30L/0)

Fried/DC-8 (4.6L/0)

Project Data/DC-8 (5L/0)

Singh/DC-8 (11L/8L)

Sachse/DC-8 (DACOM) (8L/8L)

Sachse/P-3B (DACOM) (4L/4L)

Wallops (4L/30L)

NONE

NONE

NONE

NONE

NONE

136L

136L

Dryden (4L/30L)

120L

18L

20L

284L

272L

8L

722L

Hilo (1L/0)

30L

5L

5L

11L

8L

12L

71L

Guam (1L/1L)

30L

5L

5L

19L

16L

8L

83L

Hong Kong (5L/8L)

150L

23L

25L

119L

104L

52L

473L

Yokota (9L/15L)*

270L

41L

45L

219L

192L

96L

863L

Hilo (1L/0)

30L

5L

5L

11L

8L

4L

63L

Dryden (P-3B only) (1L/1L)

30L

5L

5L

19L

16L

8L

83L

* Includes Midway
Notes:  LN2 total needed per flight day = 63L
            LN2 total needed per non-flight day = 20L
            Flight days at each location include transit flights to next site. 
            P-3B down day in Hilo and transit flight from Wake Island to Guam were added to the P-3B calculation.

 

PI Dry Ice Requirements

  Site Dry Ice Requirements

(Flt Days/Non-Flt Days)

PI/Aircraft Dry Ice Requirements
(Flight days/Non-Flight Days)

 

 

TOTALS

 

Singh/DC-8 
(5 lbs/5 lbs)

Talbot/DC-8
(30 lbs/30 lbs)

Kondo/P-3B
(40 lbs/30 lbs)

Wallops (4 lbs/30 lbs)

NONE

NONE

1060 lbs

1060 lbs

Dryden (4 lbs/30 lbs)

170 lbs

1020 lbs

70 lbs

1260 lbs

Hilo (1 lbs/0)

5 lbs

30 lbs

110 lbs

145 lbs

Guam (1 lbs/1 lbs)

10 lbs

60 lbs

70 lbs

140 lbs

Hong Kong (5 lbs/8 lbs)

65 lbs

390 lbs

440 lbs

895 lbs

Yokota (9 lbs/15 lbs)*

120 lbs

720 lbs

810 lbs

1650 lbs

Hilo (1 lbs/0)

5 lbs

30 lbs

40 lbs

75 lbs

Dryden (P-3B only) (1 lbs/1 lbs)

NONE

NONE

70 lbs

70 lbs

*Includes Midway

Notes:  Dry Ice total needed per flight day = 75 lbs
            Dry Ice total needed per non-flight day = 65 lbs
            Flight days at each location include transit flights to next site.
            P-3B down day in Hilo and transit flight from Wake Island to Guam were added into P-3B calculation.