Date |
Schedule/Status |
June 5, 2003 |
- Fly piggyback with WINDRAD to beacon 200 miles offshore;
2 tower passes on departure and a few minutes of MBL sampling on return.
|
June 6, 2003 |
- No flight
- Aircraft access 7 to 3:30 pm
- Investigator meeting at 2 pm to plan future missions/discuss status
|
June 7, 2003 |
- DC-8 access 9 to 5:30 pm
- Takeoff at noon for 3 hr. tower flyby mission.
|
June 8 2003 |
- No AC access
- Data analysis
|
June 9 |
|
June 10, 2003 |
|
June 11, 2003 |
- Piggyback with WINDRAD;
Will include MBL runs and tower flybys
|
June 12, 2003 |
- Piggyback with WINDRAD;
Will include MBL runs
|
June 13, 2003 |
- 10 hour flight with passes by Trinidad Head
|
June 14, 2003 |
- No aircraft access
- Data analysis
|
June 15, 2003 |
- No aircraft access
- Data analysis
|
June 16, 2003 |
- Download LRR
- Instrument calibration
- Ground tests
|
June 17, 2003 |
- Last DICE flight;
Tower flybys, Trinidad Head flybys, Central Valley sampling
|
June 18, 2003 |
- Download instruments, disassemble and pack-up ground station
|
June 19, 2003 |
|
June 20, 2003 |
|