PEM Tropics-B Expedition Plan |
![]() |
6.1.1 PEM Tropics B Data Archive Format.
6.1.3 PEM Tropics B Data Archive.
6.1.4 Data Handling and Certification for Release to Archives.
7.2.2 Hangar Safety and Emergency.
7.2.4 Installation of Instruments.
7.2.7 Aircraft Safety and Inspection.
7.3 Experiment On-board Hardware.
7.5.2 Travel Support Coordination .
7.5.3 Passport, Visas and Access Badges.
7.5.4 Personal Baggage on DC-8 and P-3B.
7.5.7 Supplies and Expendables.
7.5.8 Field Communications Systems.7.6 Intensive Site Support and Meetings.
7.7 Aircraft Access on Parking Ramp.
7.8 Flight Operations Guidelines.
7.8.1 Aircraft Seat Assignments.
7.8.3 Pre/Post Flight Instrument Preparations.
7.8.4 In-flight Safety Requirements.
7.9 Nominal Activities for Non-flight Days.
9.0 APPENDICES
A: Acronyms, Abbreviations and Notations (TBS)
D: Synopsis of Potential Flight Profiles .
F: DC-8 Data Acquisition and Distribution System (DADS) Characteristics.
G: P-3B Project Data System (PDS) Characteristics.
H: Program and Project Personnel Information.
I: Site Supplies and Expendables.
J: Lodging and Ground Transportation.
K: Shipping Addresses and Procedures.
L: Operational Site Information.
M: Experimentors aircraft hardware and pre/post and flight operations requirement
[Return to the Data Available]
[Return to the GTE Field Missions]
[Feedback]